Difference between revisions of "Heifer International"

From FranaWiki
Line 1: Line 1:
 +
[[Image:Heifer-hq.jpg|thumb|The Heifer International headquarters in Little Rock. Photo by Phil Frana.]]
 
'''Heifer International''' Heifer International is a non-profit organization founded in 1944 by Indiana farmer and Church of the Brethren educator [[Dan West]]. Heifer's website states that although past programs have benefited from the support of religious organization (i.e. mission trips), it has no specific religious affiliations. [[Jo Luck]] has been president of Heifer since 1992.
 
'''Heifer International''' Heifer International is a non-profit organization founded in 1944 by Indiana farmer and Church of the Brethren educator [[Dan West]]. Heifer's website states that although past programs have benefited from the support of religious organization (i.e. mission trips), it has no specific religious affiliations. [[Jo Luck]] has been president of Heifer since 1992.
 
    
 
    

Revision as of 17:39, 29 February 2008

The Heifer International headquarters in Little Rock. Photo by Phil Frana.

Heifer International Heifer International is a non-profit organization founded in 1944 by Indiana farmer and Church of the Brethren educator Dan West. Heifer's website states that although past programs have benefited from the support of religious organization (i.e. mission trips), it has no specific religious affiliations. Jo Luck has been president of Heifer since 1992.

Heifer currently has 350 projects in 55 countries. This number includes the US, which receives assistance in 28 states. Last year's local projects included helping Hurricane Katrina victims and providing earthworms, chickens, and other animals to gardens in Little Rock, Arkansas.

The majority of the work that Heifer does involves bringing animals into a struggling community. Heifer volunteers show locals how to take care of the livestock in hopes of changing populations from the ground up. Animals included in the program are alpacas, bees, rabbits, and water buffalo.

New work sites are chosen based on factors such as viability, location, area stability, and accessibility to Heifer workers. Taking these factors into consideration, the organization reviews the site to measure the likelihood of success. Once a site has been established it takes between six months and two years before any animal is actually delivered. In addition to sites worldwide, twenty-five states in the United States also receive assistance from Heifer.

The first Heifer headquarters was located in St. Louis, Missouri. The nonprofit was originally called, and is still sometimes identified as, Heifer Project International. In the 1970s the nonprofit moved its main operations to Arkansas, making its home at 1015 Louisiana Street in Little Rock.

Heifer moved into its current headquarters building near the Clinton Presidential Center in March 2006 as part of an effort to revitalize downtown Little Rock by creating a proposed international non-profit business corridor. Said Heifer VP Tom Peterson, "We would not have built here if it were not for the library." The Heifer corporate headquarters building cost $17.5 million, and occupies a 26-acre site. The Heifer groundbreaking ceremony took place on October 29, 2003.

Heifer's Little Rock headquarters is the first platinum-rated building in Arkansas under LEED certification standards. This is a notable achievement as less than fifty ecofriendly buildings hold this honor in the United States. In 2007, The American Institute of Architects Committee on the Environment selected the Little Rock Headquarters as one of Top Ten Green Projects of the year. In January 2008 the Heifer headquarters received one of thirteen prestigious Institute Honors Awards for Architecture. Reese Rowland at Polk Stanley Yeary Architects designed the award-winning building, and CDI Contractors built the headquarters. Visitors can tour the building from Monday through Friday at 11 AM and 3 PM.

Heifer International is in the process of adding an additional hunger educational facility to its Little Rock headquarters. The Murphy Keller Education Center is a $7.5 million project slated for completion in 2009. A proposed Global Village on the site is not yet under construction.

References

  • Larry Copeland, "City Takes Cue from Comeback Kid: Clinton Library Breathes Life into Struggling Little Rock," USA Today, October 8, 2004.
  • "Heifer Building Gets Architecture Honor," Arkansas Democrat-Gazette, January 13, 2008.
  • Deborah Horn, "Heifer International: World Sees Our Charitable Culture," Arkansas Business, March 15, 2004.
  • "Moving to the East Side," Arkansas Business, September 22, 2003.

External links