Difference between revisions of "Arkansas River Trail"

From FranaWiki
Line 2: Line 2:
  
 
The trail is planned to be completed sometime in 2008, when it will reach a stretch of 24 miles, while circling around the Little Rock, North Little Rock, and the Big Dam Bridge. The trail begins and ends at the [[Clinton Presidential Library]] in the [[River Market District]], but the greatest attraction is atop the Big Dam Bridge, which stretches over the Arkansas River; which sees hundreds of visitors each day. The trail in itself is very peaceful and quiet, except for the roars of the dam located on the river. The River Trail will eventually cross the Rock Junction and Junction Bridges, the funding being paid for by the [[Clinton Foundation]]. The trail is also looking to acquire land near the Union Pacific railroad. Union Pacific has given their provisional acceptance for the building of a small bridge near the station.  
 
The trail is planned to be completed sometime in 2008, when it will reach a stretch of 24 miles, while circling around the Little Rock, North Little Rock, and the Big Dam Bridge. The trail begins and ends at the [[Clinton Presidential Library]] in the [[River Market District]], but the greatest attraction is atop the Big Dam Bridge, which stretches over the Arkansas River; which sees hundreds of visitors each day. The trail in itself is very peaceful and quiet, except for the roars of the dam located on the river. The River Trail will eventually cross the Rock Junction and Junction Bridges, the funding being paid for by the [[Clinton Foundation]]. The trail is also looking to acquire land near the Union Pacific railroad. Union Pacific has given their provisional acceptance for the building of a small bridge near the station.  
[[Image:<a href="http://s235.photobucket.com/albums/ee210/davari3/?action=view&current=P1040521_1.jpg" target="_blank"><img src="http://i235.photobucket.com/albums/ee210/davari3/P1040521_1.jpg" border="0" alt="Photobucket"></a>]]
+
 
  
  

Revision as of 01:41, 5 March 2008

]The Arkansas River Trail (or as it is also known, the Millennium Trail) is an ongoing project in the Little Rock and North Little Rock, AR, areas. It is paved with asphalt, making it very accessible to cyclists, walkers, joggers, and runners alike. With its friendly environment and beautiful scenery, including an overlook of the Arkansas River from on top of the Big Dam Bridge (otherwise known as the Pulaski County Pedestrian and Bicycle Bridge), the River Trail has become a very popular attraction for the local population, sight seers and tourists. The trail is traffic-free for the vast majority of the trail. The traffic is limited to parking areas for all of those who would be visiting the trail.

The trail is planned to be completed sometime in 2008, when it will reach a stretch of 24 miles, while circling around the Little Rock, North Little Rock, and the Big Dam Bridge. The trail begins and ends at the Clinton Presidential Library in the River Market District, but the greatest attraction is atop the Big Dam Bridge, which stretches over the Arkansas River; which sees hundreds of visitors each day. The trail in itself is very peaceful and quiet, except for the roars of the dam located on the river. The River Trail will eventually cross the Rock Junction and Junction Bridges, the funding being paid for by the Clinton Foundation. The trail is also looking to acquire land near the Union Pacific railroad. Union Pacific has given their provisional acceptance for the building of a small bridge near the station.


References

External links